Econtainer Bridge, this is the name of the project that will connect Route 461 to the entrance of the National Park in Palestine and will be built with recycled containers.

This bridge 160 meters long will have balconies to watch and will be able to bicycle traffic, pedestrians and some public transport vehicles to move within the park.

Currently the project is in the detailed design stage, and then continue with the implementation of this.

The architects of Architecture Studio Yoam Messer designed this bridge considering that the National Park  is a project that aims to : convert one of the largest garbage dumps in the world in green and full of life.

Publisher: Lebanese Company for Information & Studies

Editor in chief: Hassan Moukalled


Consultants:
Lebanon : Dr. Zaynab Moukalled Noureddine, Dr. Naji Kodeih
Syria : Joseph el Helou, Asaad el kheir, Mazen el Makdesi
Egypt : Ahmad Al Droubi
Managing Editor : Bassam Al-Kantar

Administrative Director : Rayan Moukalled

Address: Lebanon, Beirut, Badaro, Sami El Solh | Al Snoubra Bldg., B.P. 113/6517 | Telefax : +961-01392444 - 01392555-01381664 | email: [email protected]

Pin It on Pinterest

Share This