Many are wondering about a mystery that is recurring in most of the binding projects, particularly those related to the environment.

From dams through crushers and Sanders down to factories, power plants and waste dumps, which the modern state decided to franchise to the private sector in order to decide their locations and cost!

However, does it remain a mystery, when it eliminates the Treasury’s direct resources and costs the citizen presumed loss of his services’ quality, and affirms the fear of the Constitution and the law, and no one does raises his voice around it?

Why is it that in each project, and the final one is what our website (greenarea.info) revealed about the dangerous mistakes in the Mseilha dam, which double its cost, and therefore the “poor” contractor turns into someone who is demanding his financial rights as a compensation, which exceeds the origin of the project, as the absence of the Environmental impact study appears in each project, as if it was presented “just because it obligatory.”

A Mechanism that has become blatant and does not need a genius to discover, but rather needs what it left of timidity or what is left of the law, but unfortunately, this political class lack it.

Publisher: Lebanese Company for Information & Studies

Editor in chief: Hassan Moukalled


Consultants:
Lebanon : Dr. Zaynab Moukalled Noureddine, Dr. Naji Kodeih
Syria : Joseph el Helou, Asaad el kheir, Mazen el Makdesi
Egypt : Ahmad Al Droubi
Managing Editor : Bassam Al-Kantar

Administrative Director : Rayan Moukalled

Address: Lebanon, Beirut, Badaro, Sami El Solh | Al Snoubra Bldg., B.P. 113/6517 | Telefax : +961-01392444 - 01392555-01381664 | email: [email protected]

Pin It on Pinterest

Share This